Hidalgo Drain - Phase I
This project consists of upgrading the existing culvert structures, cleaning, regrading and widening of the existing ditch to increase linear detention and positive flow to the outfall at the Mission Inlet.
Hidalgo Drain - Phase II (Military Rd. Crossing)
This project consists of upgrading the existing culvert structures, cleaning, regrading and widening of the existing ditch to increase linear detention and positive flow into the IBWC Floodway System.
Hidalgo Drain - Phase III (Dicker Rd. Crossing)
This project consists of upgrading the existing culvert structures, cleaning, regrading and widening of the existing ditch to increase linear detention and positive flow into the IBWC Floodway System.
Type of Project |
2018 Bond Project |
Engineer |
B2Z Engineering, LLC |
Contractor |
Phase I - TBD
Phase II & III - Mor-Wil, LLC |
Cost |
Phase I - TBD
Phase II - $200,322.50
Phase III - $494,718.55 |
Status |
In Progress |