HIDALGO DRAIN

ABOUT THE PROJECT

Hidalgo Drain - Phase I

This project consists of upgrading the existing culvert structures, cleaning, regrading and widening of the existing ditch to increase linear detention and positive flow to the outfall at the Mission Inlet.

 

Hidalgo Drain - Phase II (Military Rd. Crossing)

This project consists of upgrading the existing culvert structures, cleaning, regrading and widening of the existing ditch to increase linear detention and positive flow into the IBWC Floodway System.

 

Hidalgo Drain - Phase III (Dicker Rd. Crossing)

This project consists of upgrading the existing culvert structures, cleaning, regrading and widening of the existing ditch to increase linear detention and positive flow into the IBWC Floodway System.

Type of Project 2018 Bond Project
Engineer B2Z Engineering, LLC
Contractor Phase I - TBD
Phase II & III - Mor-Wil, LLC
Cost Phase I - TBD
Phase II - $200,322.50
Phase III - $494,718.55
Status In Progress
 